WIP By Day

The WIP By Day component shows the number of jobs of a given WIP type (specified by the Target parameter) over the last 1-30 days (specified by the Days parameter). You can add Annotations to the graph (dashed horizontal lines with a label which can represent anything, such as target numbers)

Â