Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 13 Next »

to be released….

API Endpoints

Added a new endpoint POST /orders/assign_tray that allows setting tray number for orders.

Changed POST /jt/checkin to accept an operator number to associate with the job track record.

Remote Orders

Fixed an issue where specifying _SLAB before HBOX would cause the supplied slab off value to be ignored for some jobs.

Fixed an issue with the Eyefinity interface where "Use VisionStar encryption key" setting was not always respected.

XML Exports

Fixed an issue where spaces in file paths could cause export issues.

Work Tickets

Fixed an issue where system setting "Create PDF of W/T in Folder" was not creating the requested PDF.

XML Work Tickets

The value of BCOCIN was incorrect for a digital SV design that had the CENTER-DESIGN flag set to “Y”. This affected the spaces between the lenses drawn on the XML work ticket.

Order Entry

When calling the 2D draw feature and switching from left-eye to both eyes, on some computers Rx-Universe would stop responding.

Package pricing has been added.

When adding orders notes, if the customer is a VSP account, use the order ship-to when processing the order note for e-mailing.

Devices

  • OMA interface

    • Added functionality for _CKNRPRSM and _CKDRPRSM labels for the MEI device.

    • Added flags to control how the CKPWR and CKPRSM label are used with single-vision lenses.

Eyefinity Interface

If Eyefinity sends a UPC that doesn’t exist in the frame inventory, we are now adding the UPC and frame information to the Order Remarks.

Reports

  • A new Accounts Receivable report has been added to the “Reports / AR reports” menu. The report is called “Sales Analysis by Entity”. It contains the sales by date range group sales item type. See Sales Analysis by Entity report

  • A new Breakage Report has been added to the “Reports / Order Reports / Legacy Reports” menu. The report is called “Orders Production Report - Breakage”. It contains the sales by date range group sales item type. See Orders Production Report - Breakage - Rx-Universe - Confluence (atlassian.net)

  • A new Cost of Sales by Customer Report has been added to the “Reports / Order Reports / Completed Orders” menu. It contains the cost of lenses and frames for a date and customer range. See Cost of Sales by Customer Report

  • No labels