Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 11 Current »

Search Optifacts User Documentation


Table of Contents (on this page)


Introduction

This document provides instructions for re-allocating a frame bin after Breakage.

Procedure

There is a  flag in the Frame Marry tracking station that will require a job to pass through the Frame Marry process. If the frame was married and breakage posted AFTER the job passed through Frame Marry, it will have to pass through the Frame Marry process again before it is allowed through mailout. If available, the same frame bin gets used the first time it was processed through bin assignment.

The shipping station will need to return the job to the Frame Department if they receive a job that will not mail out. The Mailout Station will display a message on the screen that the job must pass through the Frame Marry station or bin deallocation before allowed through mailout.

Refer to the Frame Receipt and Bin Assignment After Order Entry for full instructions.


To view and download these instructions as a PDF file, click on the following document image.

  • No labels