Introduction

This document provides instructions for setting up Master and Sub-master tray tracking stations.

Procedure

Anchor
master
master

Setup

Master Tray Track

Stations

Station Setup

From the Optifacts main menu:

Type Select Option 7 - Tray Track and press enterEnter.

Type Select Option 12 - Tray Track Configuration and press enterEnter.

Type Select Option 1 - Master Station Number Setup and press enterEnter.

The Master Station Number Setup screen displays.

Image Removed

Type Q for

Image Added

  • Press “Q” to query.

Search for the master station numbers or descriptions, as determined by your system administrator.

  • Enter the predetermined the number in the master station number field.
  • Press escape Escape to show the results.

If the entries do not exist:

  • Press A “A” to add a record.
  • Type Enter the Master Station Number and press enterType
  • Enter the Master Station Description and press enter.
  • Press escape Escape to save the data.
  • Type E Press “E” to exit the screen.
InfoThere is a

Ensure that the predefined default master station set by Optifacts

that needs to be setup

is set up. If it does not exist, as shown below, contact your Optifacts support representative for assistance.

Master Station Number - 31000

Master Station Description - OPTIFACTS DFLTS

Image Removed

Image Added


Examples:

Some examples of Master Stations are listed below:

Check with Optifacts support or your lab administrator for the list of default master station numbers and descriptions that you must be useduse. These may already be setup set up for you when your system is delivered. Your administrator may setup set up as many others as required by your lab operation, and you should check with them for a complete list of required master stations.

  • Mail Room
  • Interfaces
  • Production
  • Pre-Prod/Wait
  • Tracking
  • Surfacing
  • Finishing
  • Stock Room
  • Tracer
  • Order Entry
  • Breakage
  • Redo
Setup

Sub-Master Tray Track

Stations

Station Setup

From the Optifacts main menu:

Type Select Option 7 - Tray Track and press enterEnter.

Type Select Option 12 - Tray Track Configuration and press enterEnter.

Type Select Option 2 - Sub-Master Station Number Setup and press enterEnter.

The Sub-Master Station Number Setup screen displaysis displayed.

Image Removed

Type Q for

Image Added

  • Press “Q” to query.

Search for the sub-master station numbers or descriptions, as determined by your system administrator.

  • Enter the predetermined number in the master station number field, or enter the predetermined number or description in the applicable appropriate fields.
  • Press escape Escape to show the results.

If the entries do not exist:

  • Press A “A” to add a record.
Note:
Info

The Master Station must be set up before adding a Sub-Master Station.

  • Enter the following data, pressing enter Enter past each field.
  • Master Station Number
  • Sub-Master Station
  • Station Description
  • Station Type - Press enter Enter to accept N as the default entry. Otherwise, use an option from the following list.
  • N - Normal
  • Y - Warrnty/Rtrns
  • X - Verify Fnshd
  • C - Cancellation
  • D - Tray Up Dflt
  • P - Pick Ticket
  • L - Order Entry
  • U - Unmail/Uncancel
  • Z - Wait Stations
  • W - Force Wrk Tck
  • R - Recall
  • I - Rx Transfer
  • S - Stock Pricing
  • F - Force Verify
  • M - Mailout
  • T - Cancel Transfer
  • B - Breakage
  • V - Verify SemiF
  • E - Mailout Error
  • O - Short Orders
  • Station Priority - 0 is the default priority number
  • Lite-up Number - Enter the desired lite-up number that is associated with this sub-master station. This is the The lite-up number seen is shown on the pricing options page in Rx Order Entry.
  • Delay station
  • Enter Y “Y” to indicate that this is a delay station and will stop the clock on the production time reports.
  • Enter N “N” if not a delay station.
  • Interface Port - Enter the desired port ID for the machine interface (i.e. - , ttyd0a)
  • Naming The naming convention for machine interface (lower case only - upper case is for modem connections).
    • tty - Standard
    • r - Rocket Port
    • d - Digi Port
    • a - The port the machinery is plugged into (a, b, c, etc.)
    • 0 - Row on the port (i.e., Rocket Port has two sections--First Rocket Port will start with 0 and 1; the second Rocket Port will start with 2 and 3, etc.) a - The port the machinery is plugged into (a, b, c, etc.)
  • After Breakage - Set to Y “Y” if applicable. This will require requires that the job pass through Frame Marry again after a posting breakage is posted. If . For example, if the frame was married and a breakage was posted AFTER Frame Marry, the job will have to pass through the Frame to Come process again in order for a frame bin to be reassigned. If available, the same frame bin will be used as the first time it was processed through bin assignment.
  • Press escape Escape to save the data.
  • Type E Press “E” to exit the screen.
InfoThere is a

Ensure that the predefined default sub-station set by Optifacts

that needs to be setup

is set up. If it does not exist, as shown below, contact your Optifacts support representative for assistance.

Master Station Number - 31000

Master Station Description - OPTIFACTS DFLTS

Image Removed

Image Added

Examples

Some examples of Sub-Master Stations are listed below:

Check with Optifacts support or your lab administrator for the list of default sub-master station numbers and descriptions that must be used. These may already be setup set up for you when your system is delivered. Your administrator may setup set up as many others as required by your lab operation, and you should check with them for a complete list of required sub-master stations.

  • Stock Room
  • Frame to Come
  • Wait for Info
  • Billing Room
  • Rx Transfer
  • Scratch, defect, and other Breakage stations
  • Dr Redo, Lab Redo Defect, Warranty, and other Redo stations
  • Complimentary
  • Generator
  • Edger
  • Tinting
  • AR Coat
  • ... and many others

Sub-Master Station Descriptions that have associated functionality or processes.

Although you can scan trays into these stations via a scanner not attached to a computer, the special effects associated with the name will only work through Station Assignment. Check with Optifacts for a complete list.

JOB DATA ENTRY

  • This setup looks for job data fields associated with a given tray. All fields triggered get prompted. It allows you to edit Medicaid numbers or PO numbers after initially entering them.
  • It also allows a layout operator to escape from the data prompts to allow a second station to deal with miscellaneous data.

Refer to the Job Data Entry Change Station Setup & Process document for full instructions.

Image Added

MRP BLOCKING

  • Forces a tray to MRP Blocking and prints a new work ticket. It is convenient if specific generator/blocker configurations require MRP blocking, but the determination to use this combo gets done after the Order Entry process. It also saves an operator from going back into Order Entry to recall for this one function.

Image Added

SPECIFY BLOCK

  • Allows an operator to enter block sizes for a LOH blocker for a given job. Requires that you have set up the following two stations in Job Data Definitions and Job Data Triggers.
    • SPECIFY BLOCK R
    • SPECIFY BLOCK L

Image Added

Image Added

Image Added

Image Added

PRICING STATION

  • Allows you to enter lite-up options missed at order entry without going back into Order Entry.
  • Will work with dependency options.
  • Will turn off a lite-up that was already on.
  • WILL NOT prompt for a frame price or other hand price if the lite-up requires hand pricing or comment entry.

Image Added

SURFACE BLOCK

  • Touches a file referenced by the surfacing equipment to determine if enough chill time has passed. It allows a workaround for non-interfaced blockers, but it is only available through Station Assignment.