Introduction
This document provides instructions for re-allocating a frame bin after Breakage.
Procedure
There is a flag in the Frame Marry tracking station that will require a job to pass through the Frame Marry process. If the frame was married and breakage posted AFTER the job passed through Frame Marry, it will have to pass through the Frame Marry process again before it is allowed through mailout. If available, the same frame bin gets used the first time it was processed through bin assignment.
The shipping station will need to return the job to the Frame Department if they receive a job that will not mail out. The Mailout Station will display a message on the screen that the job must pass through the Frame Marry station or bin deallocation before allowed through mailout.
Refer to the Frame Receipt and Bin Assignment After Order Entry for full instructions.
To view and download these instructions as a PDF file, click on the following document image.
View file |
---|
name | Frame Bin Reallocation after Breakage.pdf |
---|
height | 250 |
---|
|