Search Optifacts User Documentation
Table of Contents (on this page)
Introduction
This document provides instructions for re-allocating a frame bin after Breakage.
Procedure
There is a flag in the Frame Marry tracking station that will require a job to pass through the Frame Marry process. If the frame was married and a breakage was posted AFTER the job was passed through Frame Marry, the job will have pass through the Frame Marry process again before it can be mailed out. If available the same frame bin will be used as the first time it was processed through bin assignment.
The shipping station will need to return the job to the Frame Department if they receive a job that will not mail out. The Mailout Station will display a message on screen that the job must pass through the Frame Marry station or bin deallocation before it can be mailed out.
Refer to the Frame Receipt and Bin Assignment After Order Entry for full instruction.