Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Search Optifacts User Documentation


Table of Contents (on this page)


Introduction

This document provides instructions for re-allocating a frame bin after Breakage.

Procedure

There is a  flag in the Frame Marry tracking station that  will require a job to pass through the Frame Marry process. If the frame was married and a breakage was posted AFTER the job was passed through Frame Marry, the job will have pass through the Frame Marry process again before it can be mailed out. If available the same frame bin will be used as the first time it was processed through bin assignment.


The shipping station would need to return the job to the Frame Department if they receive a job that will not mail out. The Mailout Station will display a message on screen that the job must pass through the Frame Marry station or bin deallocation before it can be mailed out.



  • No labels