Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Search Optifacts User Documentation


Table of Contents (on this page)

Introduction

This document provides instructions for setting up the Dynamic Work-in-Process screen.

This is a screen that you call up and it refreshes the counts in selected stations every so often, you can set the time.



Procedure

To do the initial setup, do the following:

You need to set up the stations that you want to see on these screens first. This allows you to control which stations are grouped together and where they are displayed on the screen. 

Print Master/Sub-Master Station Number Report

From the Optifacts main menu:

Type 7 - Tray Track and press enter.

Type 12 - Tray Track Configuration and press enter.

Type 6 - Master/Submaster Station Number Report and press enter.

  • Type S to print on screen or P to physically print the report.

Setup

Type 7 - Tray Track and press enter.

Type 12 - Tray Track Configuration and press enter.

Type 5 - Portal Status Setup Editor and press enter.


PERFORM:   Query  Next  Previous  View  Add  Update  Remove  Table  Screen

...

Shows the previous row in the Current List.     ** 1: tt_dr_subhd table**



                 TRAY TRACK PORTAL STATUS SETUP

---------------------------------------------------------------

Sub-Master Station Number:       [1060 ]       PICK TICKET

---------------------------------------------------------------

Portal Id:  [WIP                 ]

Status Code         :             [2    ]

Station Description :             [PICK TICKET    ]


Add several entries to this screen with a portal ID of WIP. 

The Sub-Master Station Number holds each station you want reported within the lab.


Status Code is the relative line number on the screen. 

Station Description is the text that will show on the screen. 

You can have several stations mapped to the same line on the screen,

so the line will show any job at any one of the stations in the area.





For example, here are two entries for the surfacing area:


                 TRAY TRACK PORTAL STATUS SETUP

---------------------------------------------------------------

Sub-Master Station Number:       [4060 ]       TOOL ROOM

---------------------------------------------------------------

Portal Id:  [WIP                 ]

Status Code         :             [4    ]

Station Description :             [SURFACING      ]



********************************************************


                 TRAY TRACK PORTAL STATUS SETUP

---------------------------------------------------------------

Sub-Master Station Number:       [4030 ]       SPECIAL FINING

---------------------------------------------------------------

Portal Id:  [WIP                 ]

Status Code         :             [4    ]

Station Description :             [SURFACING      ]






Note:  Keep the Status Code the same for records with the same Station

Description for consistency.  Once your mapping is set up, you simply need

to choose to view the screen from the menu:


7)  Tray Track

16)  Dynamic Work In Process Screen


Enter Number of Minutes for Screen Refresh    30


Enter the number of minutes between times we refresh the screen.  We don't

recommend small increments of time like 5 minutes because this will cause

the system to do the select statements every 5 minutes and this will use up

system resources at that time.  This could slow down other processes every 5

minutes.

You can touch the Delete key to exit the screen at any time.


************************ Dynamic Work-In-Process Screen

************************

*                            IN     OUT          WIP in Station at Time

*

*  Description   Previous  Today   Today   WIP  13:10

*

* ----------------------------------------------------

*

*  PICK TICKET        523      1      0    524    524

*

*  DELAYED              4      0      0      4      4

*

*  SURFACING           23      0      0     23     23

*

*

*                       Previous In-Today   Shipped  Cancelled  WIP

*

*          Lab Totals:     889        0        0         0      889

*

*

* 18:10 Since Refresh: 30:00 Last Refreshed: 13:10 12/06/2004 Delete to Exit

*

****************************************************************************

****


The screen shows the Station Descriptions that you had created in the

mapping process. 

Previous refers to the number of jobs that were in that station

group prior to today.

IN Today shows how many jobs have moved into

those stations since midnight. 

Out Today shows the number that moved out of

those stations since midnight.

WIP is the total jobs in the station group

as a total of Previous + IN Today - OUT Today.


We will also show up to 4 columns of the WIP total for previous hours in the

day, so you can see how WIP has changed through the last 4 hours. 

The Lab Totals line shows the total number of jobs including jobs that are not

mapped to specific stations above.  The Lab Totals line includes the jobs

displayed above, but also includes jobs that are in stations outside of the

ones mapped for display on this screen.




  • No labels