Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Anchor
top
top

Search Optifacts User Documentation

Live Search
spaceKeyOPPUB
placeholderEnter search keyword(s) here


Table of Contents (on this page)

true
Table of Contents
outline
indent15px20px
stylenonebullet


Introduction

This document provides instructions for re-allocating a frame bin after Breakage.

Procedure

There is a  flag in the Frame Marry tracking station that  will that will require a job to pass through the Frame Marry process. If the frame was married and a breakage was posted AFTER the job was passed through Frame Marry, the job will have to pass through the Frame Marry process again before it can be mailed out. If available the same frame bin will be used as the first time it was processed through bin assignment.

The shipping station will need to return the job to the Frame Department if they receive a job that will not mail out. The Mailout Station will display a message on the screen that the job must pass through the Frame Marry station or bin deallocation before it can be mailed out.

Refer to the Frame Receipt and Bin Assignment After Order Entry for full instruction.Image Removed.

Image Added


To view and download these instructions as a PDF file, click on the following document image.

View file
nameFrame Bin Reallocation after Breakage.pdf
height250