Get WIP by date
Takes 4 arguments:
Start date, start time, end date, end time
Method returns the work in process numbers that occurred between the start date/time and the end date/time. Any interval can be specified.
Example:
returns
{ "jobs-in": "000008", "jobs-out": "000000", "jobs-brk": "000000", "jobs-cancelled": "000000", "jobs-transferred": "000000", "stock-in": "000000", "stock-out": "000000" }