Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 2 Current »

WIP Count, Jobs In Count, Jobs Out Count

This is a radial bar which shows the current count of jobs (WIP, In, or Out) and allows the lab to specify a goal.

WIP Breakdown

The “WIP Breakdown” component shows the number of jobs in different categories, which can be displayed as a bar graph, pie chart, or radar graph. For each element, the number of jobs can be the total, number in, number completed, number valid, number unvalid, number with AR, number late, numbers of uncut, full and finished, numbers of SV and progressive in toric and digital, by material groups. An example of the output by material, using a pie graph:

  • No labels