Introduction

This document provides instructions for printing production process flags on the work ticket.

Procedure

To identify production processes for a job, the

The appropriate Job Routing Reasons or Group Controls and Track Stages need to be entered and met

, and a

to identify production processes for a job. In addition, some Custom Configuration setting needs to be enabled.

Custom Configuration

From the Optifacts main menu:

Type Select Option 3 – Editor Utilities and press enterEnter.

Type Select Option 6 – Configuration Editor and press enterEnter.

Type Select Option 6 – Edit Custom Configuration and press enter to display the Custom Configuration Editor window.

  • Type Press “A” to add a new record.
  • Fill in all the information as per the example below, pressing enter after each field.

Enable the following Custom configuration.Image Removed

Image Added

  • Press Escape to save the data
  • Type Press "E"to exit.

Group Controls

From the Optifacts main menu:

Type Select Option 3 – Editor Utilities and press enterEnter.

Type Select Option 11 – Job Routing Menu and press enterEnter.

Type Select Option 14 – Group Control Menu and press enter Enter to display the Optifacts Group Control Menu.

Using options 4 through 11 on this menu, set up groups of accounts, materials, styles, lite-ups, colors, etc., and then use the Group Control Editor to assign them to a Group Name.Image Removed

Image Added

Menu Option 2 - Group Control Editor

The important field to note is the Control Name Set

which will be

used in the Track Stages Editor.  Again, this name set will need to start with the letters “PF” to indicate it is a Product Family with Production Processes. 

Please note:

Info

Only one Product Family can be assigned to a lens at a time

Many

You can assign many groups and stages

can be assigned

to a job, but only one can start with the letters “PF”

in order

for it to print on the work ticket.

Image Removed

Image Added

Job Routing Reasons

From the Optifacts Main Menu:

Type Select Option 3 – Editor Utilities and press enterEnter.

Type Select Option 11 – Job Routing Menu and press enterEnter.

Type Select Option 8 – Route Reason and Control Editor and press enter Enter to display the Job Routing Reason and Control Editor window.

  • Type Press “A” to add a new record.

Enter in the reasons you want to route the job to the track stages.  The important field to note here is the Group Name Set, which matches the Control Name set in the Group Control Editor.  This will be It is used in the Track Stages Editor. .  For a group to be considered a definition for a Production Process, the Group Name Set will need to start with the letters “PF” to indicate that it is for a Product Family.  Any After the “PF” indicator, any other combination of letters and numbers are is allowed after the “PF” indicator.Image Removed

Image Added

  • Press Escape to save the data.
  • Type “E” Press "E" to exit.

Track Stages

The Group Name (starting with “PF”) as used in the Job Routing Reasons will be gets used in the “GROUP NAME” field in of this table.  There are two levels: Stages and Steps.  Each Group group can have more than one Stage, and each Stage can have more than one Step.  If the job should be stopped and warned if not following the stages/steps in order, “Required” should be set to ‘Y’, “Y”’ otherwise set to ‘N’“N.

From the Optifacts Main Menu:

Type
  • Select Option 7 – Tray Track and
press enter
  • Press Enter.
Type
  • Select Option 12 – Tray Track configuration and
press enter
  • Press Enter.
Type
  • Select Option 11 - Track Stages Editor and
press enter
  • Press Enter to display the Configure Track Stop Stages window.
  • Type Press “A” to add a new record.
Info

 ***Refer to the Track Stop Stages document for full complete instructions on setup. ***

First, decide which stages need controls.

Example: Glass Jobs

  • Should first go through Surfacing.
  • Then should go through Inspection.
  • Then should go through Coating.
  • Then should go through the Out Coating station.
  • Then should go through the Frame Received Station.
  • Then should go through the Edging Process.
Image Removed

Image Added

These are the fields that

are

get used for the Production Processes:

  • The Stage Number is the Sort Order which indicates what order the processes will print on the RX work ticket.
  • The Stage Name will not print, but you can be used use it as a descriptor for this record.
  • The Step Number is not used, but you can also be used use it as a descriptor for this record.
  • The Step Name is the code that is used to print on the work ticket.

Example: 

For a job assigned to the group PF GLASS, as mentioned above, the values that would print in the Production Processed field would be:

S C E I

- SURFACING, COATING, EDGING, INSPECTION

Entering a Job

From the Optifacts main Menumenu:

Type

Select Option 4 - Run Layout and press Enter.

Enter a job as normal in Layout Order Entry that fits the criteria for a Track Stop Stages group. The Production Processes Codes will print on the work ticket.


To view and download these instructions as a PDF file, click on the following document image.

View file
namePrinting Production Proccesses.pdf