Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Under "Setup", "Date Wanted Setup", the lab can specify days by material, type of lens (semi-finished or finished), and by Rx within that material.  For each material for which the lab wishes to specify the number of days, a record similar to the following can be created:
Image RemovedImage Added

In the above example, a Poly job that used semi-finished blanks would take 3 days; a finished Poly lens only 2 days.  If the lens is above a 6.00 sphere, or below a -8.00 sphere, or above below a -4.00 cyl, above 5D of prism, or has an add of 3.75 or greater greater than 4.00 then it will be set to 4 days (not this is in lieu of the other days, not in addition to).  However, an extra day is added if the job is to be edged and mounted (a complete job).

...